Company record
1996
- Installation of the 22 kV Nam Mong Hydro power, as the sub-contractor of Dai Nippon International Division.
- Turnkey contract for the transmission line of Huay Saloy Micro-hydropower Project, under the Grant of the government of Japan to the government of Lao PDR.
- Installation the roads traffic lights in Vientiane and Louangphrabang.
1999
- Turnkey contract under the protocol 1997 between of the government of France and the government of Lao PDR, the installation of 22 kV double circuits , rehabilitation of HV and LV distribution line in Vientiane Capital
(Including 3.5 km underground )
2000
- Contract for the Provincial Transmission and Distribution Development Project, under the Asian Development Bank Loan No.1558 Lao(SF)
- As the sub contractor of ABB Transmission and Distribution Systems, SA., the project of 34.5 kV shield wire
2004
- Sub contractor of Jaguar Oversea Limited (JOL) India, for 112.5 km of 115 kV Transmission line Ban Na to Attapeu, the jobs were from the check survey to the commissioning
- Sub contractor of China-East Resources Import & Export Co.,( CERICO) for 120 km of stringing of 115 kV Transmission line Pakse to Khone Phapheng .
2005
- Contract “ Rural Electrification Project “(REP) with EdL, where the scope of work is : erection 22 kV and 0.4 kV net work, erection of distribution transformers ( including survey and design)
- Contract “ Northern Area Rural Power Distribution Project”(NARPD) with EdL, where the scope of work is the same as REP.
2006
- Installation of EdL’s temporally substation ( Installed 115/22 kV, 8 MVA ) Xeset hydropower I, Saravanh province.
- Repair of EdL’s 115 kV transmission line project , Sanluang area, Xiengkhouang province, single circuit 4 Km of length
- Contract “ Rural Electrification Project “(REP) with EdL, where the scope of work is : erection 22 kV and 0.4 kV net work, erection of distribution transformers ( including survey and design)
- Contract “ Northern Area Rural Power Distribution Project”(NARPD) with EdL, where the scope of work is the same as REP.
2007
- Repair of EdL’s 115 kV transmission line project, 1 tower ( tower 334 ) 0.777 km length, Keokuang village area, Phoukoun District, Luang prabang Province.
- Contract “ Rural Electrification Project “(REP) with EdL, where the scope of work is : erection 22 kV and 0.4 kV net work, erection of distribution transformers ( including survey and design)
- Contract “ Northern Area Rural Power Distribution Project”(NARPD) with EdL, where the scope of work is the same as REP.
2008
- Contract “ Rural Electrification Project “(REP) with EdL, where the scope of work is : erection 22 kV and 0.4 kV net work, erection of distribution transformers ( including survey and design)
- Contract “ Northern Area Rural Power Distribution Project”(NARPD) with EdL, where the scope of work is the same as REP.
- Contract with Nam Theun 2 Power Company ( NTPC ), Installation of 0.4 kV at Khammouan Province.
2009
- Contract with Okidenko Company ( Japan ), Installation of 22 kV and 0.4 kV at Mai District, Phongsaly Province.
- Contract with Vichitbhan Company ( sub contract of Theun-Hinboun ), Installation of 22 kV and 0.4 kV at Bolikhamxay Province.
Last Updated (Saturday, 17 October 2009 23:34)